Notice: Function _load_textdomain_just_in_time was called incorrectly. Translation loading for the wp-security-audit-log domain was triggered too early. This is usually an indicator for some code in the plugin or theme running too early. Translations should be loaded at the init action or later. Please see Debugging in WordPress for more information. (This message was added in version 6.7.0.) in /www/houstonisd_462/public/wp-includes/functions.php on line 6121
Notice: Function _load_textdomain_just_in_time was called incorrectly. Translation loading for the hustle domain was triggered too early. This is usually an indicator for some code in the plugin or theme running too early. Translations should be loaded at the init action or later. Please see Debugging in WordPress for more information. (This message was added in version 6.7.0.) in /www/houstonisd_462/public/wp-includes/functions.php on line 6121
Notice: Function _load_textdomain_just_in_time was called incorrectly. Translation loading for the ceris domain was triggered too early. This is usually an indicator for some code in the plugin or theme running too early. Translations should be loaded at the init action or later. Please see Debugging in WordPress for more information. (This message was added in version 6.7.0.) in /www/houstonisd_462/public/wp-includes/functions.php on line 6121 HISD Conducting Districtwide Campus Assessment Following Hurricane Beryl - HISD Source
Houston ISD officials are assessing conditions of all campuses in the wake of Hurricane Beryl, which hit the city on July 8, and hope to have a full assessment soon.
Widespread power outages, damaging winds and heavy rainfall caused downed trees and flooded roadways over the entire Houston area and parts of Southeast Texas.
HISD Executive Director of Multimedia Communications Richard Guerra said that a return to normal operations will happen as soon as possible.
Beryl, a category 1 hurricane, killed at least seven people as of July 9, according to Harris County Officials.
CenterPoint Energy is working to restore electricity to more than 1 million customers who are still without power.